Hawke’s Bay Regional Council has received an application for resource consents from KiwiRail, for the cyclone recovery works at Tutaekuri Rail Bridge (217) Awatoto in accordance with the Severe Weather Emergency Recovery (KiwiRail Holdings Limited) Order 2023 (OIC-KR).
The works are required in response to Cyclone Gabrielle (which meets the definition of a severe weather event). The site is within the area identified as an affected rail route in Schedule 1, Part 2, of the OIC-KR.
Applicant: KiwiRail Holdings Limited
HBRC resource consent application number: APP-131615
The proposed works for this stage (stage 3) will occur within and adjacent to the bed of a river within the Coastal Margin as defined by the Regional Coastal Environment Plan.
The works are a Controlled Activity under Section 12 of the OIC-KR.

Rail Corridor Palmerston North to Gisborne Line Bridge 217 (Tutaekuri) Awatoto.
Comments have closed.
The summary of comments is included in the s42A Report provided below along with the consent document.
Disclaimers and Copyright
While every endeavour has been taken by the Hawke's Bay Regional Council to ensure that the information on this website is
accurate and up to date, Hawke's Bay Regional Council shall not be liable for any loss suffered through the use, directly or indirectly, of information on this website. Information contained has been assembled in good faith.
Some of the information available in this site is from the New Zealand Public domain and supplied by relevant
government agencies. Hawke's Bay Regional Council cannot accept any liability for its accuracy or content.
Portions of the information and material on this site, including data, pages, documents, online
graphics and images are protected by copyright, unless specifically notified to the contrary. Externally sourced
information or material is copyright to the respective provider.
© Hawke's Bay Regional Council - www.hbrc.govt.nz / +64 6 835 9200 / info@hbrc.govt.nz